Saturday, November 24, 2012

Yeongtong Subway Line Opening

After waited for ages, the subway line at Yeongtong is finally going to open.
Unusually for Korea, the project has been going on for eons. The construction started long before we came to Korea. There was a lull for some time, and picked up a couple of years ago. Probably hit by the recession?

The service is slated to begin on December 1st (2012.12.01).
Four stations (Mangpo, Yeongtong, ChongMeong and SangKal) will get connected to the Bundang line at Kiheung.


Friday, November 23, 2012

TOPIK 2013 SCHEDULE

Test No. Test Date Registration Period Test Locations Test Results
29 2013.01.20 2012.12.13 to 12.26 Korea Only
2013.02.04
30 2013.04.20~04.21 2013.02.12 to 02.25 Worldwide 2013.05.30
31 2013.07.21 2013.06.12 to 06.25 Korea Only 2013.08.02
32 2013.10.19~10.20 2013.08.07 to 08.20 Worldwide2013.12.03

Source: TOPIK.GO.KR